tiistai 2. kesäkuuta 2015

Inside fixing

Some progress inside of Clan 1200.
Left front corner insulation
Wallpanel installed
Cooking cabinet removed
Front, new insulation installed

New carpet partly installed

Back side, floor exposed
Toilet floor exposed

sunnuntai 5. huhtikuuta 2015

Back fixing

Finally some progress. Back side stripped out and some damages found. All I need to do is "copy and paste" rotten pieces with new ones. :)

Back side, left
Back side, right
No more lights, left
No more lights, right
Back window removed and some damage found.
Back window removed and right side is ok.
Lower paner removed and damage found
Lower panel removed and riht side is ok.
Left side, closer look
Some new wood needed
And some new wood added to left side
Bottom frame of window partly removed

New parts installed
Even more new parts